National Association of Testing Authorities, Australia
Scope of Accreditation
Monadelphous Engineering Pty Ltd
GENCO PTY LTD
Site
Gladstone Operations
Accreditation No.
20465
Site No.
24513
Date of Accreditation
27 Feb 2019
Contact
Mr Cameron Hausler P: +61 (07) 48377532
Availability
Services not available to external clients
Scope of Accreditation
Gladstone Operations
ISO/IEC 17025 (2017)
Infrastructure and Asset Integrity
Service | Product | Determinant | Technique | Procedure | Limitations |
---|---|---|---|---|---|
Non-destructive testing (NDT) - Magnetic particle testing | Metallic surfaces - Magnetic | Defect detection and characterisation | AC magnetic flow | ||
Non-destructive testing (NDT) - Penetrant testing | Metallic surfaces | Defect detection and characterisation | Solvent removable; Water washable | ||
Non-destructive testing (NDT) - Ultrasonic testing | Metallic piping; Metallic plate | Material thickness - Spot/grid only | A-scan - Manual; Thickness meter | ||
Material loss characterisation; Profiling | A-scan - Manual | ||||
Welded joints - Ferritic materials | Defect detection and characterisation | A-scan - Manual | |||
Non-destructive testing (NDT) - Ultrasonic testing - Specialised - Phased array (PAUT) | Welded joints - Ferritic materials | Defect detection and characterisation | Manual | ||
Non-destructive testing (NDT) - Visual testing - During service life | Welded joints | Defect detection | Visual testing | Welds on piping, vessels and structures. | |
Non-destructive testing (NDT) - Visual testing - Prior to initial service | Castings; Forgings; Rolled products | Defect detection | Visual testing | ||
Welded joints | Defect detection | Visual testing |
The only data displayed is that deemed relevant and necessary for the clear description of the activities and services covered by the scope of accreditation.
Grey text appearing in a SoA is additional freetext providing further refinement or information on the data in the preceding line entry.
Accreditation No.
20465
Site No.
24513
Print date
08 Oct 2024
END OF SCOPE