McConnell Dowell Constructors (Aust) Pty Ltd

Site

McConnell Dowell Constructors (Aust) Pty Ltd – MCD Hydro

Accreditation No.

2461

Site No.

2454

Date of Accreditation

01 Sep 1988

Address

Level 3, 109 Burwood Road
Hawthorn, VIC 3122
Australia

mcconnelldowell.com

Contact

Mr Awais Ashraf P: +61 (03) 98162400

Availability

Services conditionally available to external clients

Scope of Accreditation

ISO/IEC 17025 (2005)

Infrastructure and Asset Integrity

Service Product Determinant Technique Procedure Limitations
Evaluation of mechanical performance of pressure plant, pipelines and equipment High pressure oil and gas pipelines Strength, leak and combined pressure evaluation Not applicable

AS/NZS 2885.4, AS/NZS 2885.5, ASME B16.3, ASME B16.8,

 DNV-OS-F101 Sections 8-F600, 8-G and 10J,
 AS/NZS 4645.2 Section 6, AS/NZS 4645.3 Section 6 and ASME B31.8 Clauses 841.3, 851.5 and 851.12

Low pressure oil and gas pipelines Strength, leak and combined pressure evaluation Not applicable

APIA Code of Practice; AS 2885.5 Section 4; AS/NZS 2033 Section 7; AS/NZS 2566.2 Appendices M and N; AS/NZS 4645.2 Section 6

Water pipelines Hydrostatic pressure; Leakage Not applicable

AS 1579; AS 1631; AS/NZS 2033 Section 7; AS/NZS 2566.2 Appendices M and N

up to 10 MPa

The only data displayed is that deemed relevant and necessary for the clear description of the activities and services covered by the scope of accreditation.

Grey text appearing in a SoA is additional freetext providing further refinement or information on the data in the preceding line entry.