National Association of Testing Authorities, Australia
Scope of Accreditation
Integrated Lifting Solutions
Site
Integrated Lifting Solutions
Accreditation No.
21098
Site No.
25379
Date of Accreditation
02 May 2024
Contact
Mr Eric Bucciarelli P: +61 (08) 94346932
Availability
Services available to external clients
Scope of Accreditation
Integrated Lifting Solutions
ISO/IEC 17025 (2017)
Infrastructure and Asset Integrity
Service | Product | Determinant | Technique | Procedure | Limitations |
---|---|---|---|---|---|
Evaluation of load generating lifting appliances | Cranes | Proof load | Not applicable | AS 1418.2 and AS 1418.17 | Up to 1471 kN |
Serial and lever hoists; Winches | Proof load | Not applicable | AS 1418.2 | Up to 490 kN including on-site testing | |
Evaluation of load handling, rigging and tensioning systems | Chain slings | Proof load | Not applicable | AS 3775.1 | Up to 2000 kN |
Lifting assemblies | Proof load | Not applicable | AS 4991 | Up to 1471 kN including on-site testing. | |
Lifting clutches for concrete elements | Proof load | Not applicable | AS 3850.1 section 2.6 | Up to 2000 kN | |
Lifting components for chain slings | Proof load | Not applicable | AS 3776 | Up to 2000 kN | |
Shackles | Proof load | Not applicable | AS 2741 | Up to 2000 kN | |
Sheave blocks | Proof load | Not applicable | AS 2089 | Up to 2000 kN | |
Swivels | Proof load | Not applicable | AS 2318 | Up to 2000 kN | |
Synthetic fibre roundslings | Proof load | Not applicable | AS 4497 | Up to 2000 kN | |
Synthetic webbing flat slings | Proof load | Not applicable | AS 1353.1 | Up to 2000 kN | |
Wire rope slings | Proof load | Not applicable | AS 1666.1 | Up to 2000 kN |
The only data displayed is that deemed relevant and necessary for the clear description of the activities and services covered by the scope of accreditation.
Grey text appearing in a SoA is additional freetext providing further refinement or information on the data in the preceding line entry.
Accreditation No.
21098
Site No.
25379
Print date
26 Dec 2024
END OF SCOPE