NORMIST PTY LTD

Site

Cairns

Accreditation No.

14373

Site No.

14366

Date of Accreditation

29 Aug 2000

Address

135 Scott Street, BUNGALOW
Cairns, QLD 4870
Australia

normist.com.au

Contact

Mr Steven Sinclair P: +61 (07) 40795700

Availability

Services available to external clients

Scope of Accreditation

ISO/IEC 17025 (2017)

Infrastructure and Asset Integrity

Service Product Determinant Technique Procedure Limitations
Evaluation of load generating lifting appliances Boat davits; Brows; Cranes; Gantries and monorails; Jibs and suspension equipment; Runways and landing craft bow doors; Serial and lever hoists Proof load Not applicable

AS 1418.2, RAN - ABR 5195 Procedure 722, RAN - ABR 5195 Procedure 723, RAN - ABR 5195 Procedure 724, RAN - ABR 5195 Procedure 725, RAN - ABR 5195 Procedure 741

2 to 490 kN includes on-site testing

Evaluation of load handling, rigging and tensioning systems Anchorages and supports for industrial fall arrest systems Proof load Not applicable

RAN-ABR 5195 - Procedures 708, 712, 726, 754, 755 

2 to 490 kN includes in-site testing

Cargo barriers/restraint systems; Chain and lever blocks; Chain slings; Eye hooks; Lifting components for chain slings; Padeyes; Rigging screws and turnbuckles; Shackles; Shank hooks; Sheave blocks; Swivels; Wire rope slings Proof load Not applicable

AS 1666.1, AS 1666.2, AS 2089, AS 2317.1, A 2319, AS 2741, AS 2759, AS 3569, AS 3775.1, AS 3775.2, AS 3776, AS 3777, AS 4344, RAN - ABR 5195 Procedure 776

2 to 490 kN

Chain; Eye bolts; Eye hooks; Lifting tynes and attachments; Synthetic fibre roundslings; Synthetic webbing flat slings Proof load Not applicable

AS 1353.1, AS 1353.2, AS 2317.1, AS 2321, AS 4497, RAN - Document A013924, RAN - ABR 5195 Procedure 709, 737, 779

2 to 490 kN includes on-site testing

The only data displayed is that deemed relevant and necessary for the clear description of the activities and services covered by the scope of accreditation.

Grey text appearing in a SoA is additional freetext providing further refinement or information on the data in the preceding line entry.