Fulton Hogan Industries Pty Ltd

Site

Lara Plant Laboratory

Accreditation No.

2291

Site No.

15811

Date of Accreditation

13 Apr 1994

Address

200 Heales Road
Lara, VIC 3212
Australia

fultonhogan.com.au

Contact

Mr David Messenger P: +61 0438466926

Availability

Services conditionally available to external clients

Scope of Accreditation

Lara Plant Laboratory

ISO/IEC 17025 (2017)

Infrastructure and Asset Integrity

Service Product Determinant Technique Procedure Limitations
Evaluation of geotechnical and civil construction material - Aggregate properties Aggregates Moisture content Drying oven; Hot plate

AS 1289.2.1.1, AS 1289.2.1.6

Particle size distribution Sieve analysis

AS 1141.11.1

Evaluation of geotechnical and civil construction material - Asphalt extraction and grading Asphalts Moisture content Not applicable

RC (Vic) Method 211.01

Bitumen content and aggregate grading Pressure filter

AS/NZS 2891.3.3

Evaluation of geotechnical and civil construction material - Asphalt volumetric properties Asphalts Bulk density Presaturation AS/NZS 2891.9.2
Maximum density Water displacement AS/NZS 2891.7.1
Sample collection Aggregates Not applicable Aggregate from a conveyor belt; Aggregate from a pavement; Aggregate from a stockpile; Aggregate from a truck

AS 1141.3.1

Asphalts Not applicable Extraction of an asphalt core - Dry technique; Extraction of an asphalt core - Wet technique; Uncompacted asphalt

AS/NZS 2891.1.1, AS 2891.1.2

RC (Vic) Method 200.01

The only data displayed is that deemed relevant and necessary for the clear description of the activities and services covered by the scope of accreditation.

Grey text appearing in a SoA is additional freetext providing further refinement or information on the data in the preceding line entry.