Civiltest Pty Ltd

Site

Perth Laboratory

Accreditation No.

20853

Site No.

25035

Date of Accreditation

30 Jul 2021

Address

Unit 1 / 21 Blackly Row
Cockburn Central, WA 6164
Australia

civiltest.com.au

Contact

Mr Scott Flood P: +61 0436329990

Availability

Services available to external clients

Scope of Accreditation

Perth Laboratory

ISO/IEC 17025 (2017)

Infrastructure and Asset Integrity

Service Product Determinant Technique Procedure Limitations
Establishment of annex facilities Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited
Evaluation of geotechnical and civil construction material - Aggregate properties Aggregates Particle size distribution Sieve analysis MRWA Method WA210.1
Moisture content Drying oven; Microwave oven MRWA Method WA212.1; MRWA Method WA212.2
Evaluation of geotechnical and civil construction material - Soil classification Soils Cone plasticity index; Liquid limit; Plasticity index Cone AS 1289.3.9.1; AS 1289.3.9.2; AS 1289.3.3.2; MRWA Method WA120.1; MRWA Method WA120.2; MRWA Method WA121.1; MRWA Method WA122.1 
Sieve analysis Not applicable AS 1289.3.6.1; MRWA Method WA115.1; MRWA Method WA115.2
Linear shrinkage; Liquid limit; Plastic limit; Plasticity index; Weighted plasticity index Casagrande four point; Casagrande one point

AS 1289.3.1.1;  AS 1289.3.1.2;  AS 1289.3.2.1; AS 1289.3.3.1; AS 1289.3.4.1; MRWA Method WA 120.1; MRWA Method WA 121.1; MRWA Method WA  122.1; MRWA Method WA 123.1

Moisture content Drying oven; Microwave oven

AS 1289.2.1.1; MRWA Method WA 110.1; MRWA Method WA 110.2

Evaluation of geotechnical and civil construction material - Soil compaction characteristics Soils Assignment of optimum moisture content/maximum dry density (OMC/MDD); Dry density/moisture content relationship; Minimum and maximum dry density Modified compactive effort; Standard compactive effort

AS 1289.5.1.1, AS 1289.5.2.1, AS 1289.5.4.2; MRWA Method WA 132.1, MRWA Method WA 132.2; MRWA Method WA 133.1; MRWA Method WA 133.2

Evaluation of geotechnical and civil construction material - Soil field density Soils Density - In-situ; Density index; Dry density ratio; Field compaction for conformance; Field moisture content; Moisture ratio; Moisture ratio assessment of dry back; Relative compaction Calculation; Nuclear gauge; Statistical selection of reference values

 AS 1289.5.4.1; AS 1289.5.7.1; AS 1289.5.8.1; MRWA Method WA 134.1; MRWA Method WA 136.1; MRWA Method WA 324.2

Evaluation of geotechnical and civil construction material - Soil in-situ penetration Soils Penetration in-situ Dynamic cone; Perth sand penetrometer AS 1289.6.3.2, AS 1289.6.3.3
Evaluation of geotechnical and civil construction material - Soil laboratory bearing properties Soils Bearing ratio Remoulded specimens AS 1289.6.1.1; MRWA Method WA 141.1
Evaluation of geotechnical and civil construction material - Soil pre-treatment Soils Soil pre-treatment Not applicable

AS 1289.1.1; MRWA Method WA 105.1

Sample collection Asphalts Not applicable Extraction of an asphalt core - Wet technique

AS 2891.1.2

Soils Not applicable Disturbed sampling from earthwork; Disturbed soil sampling from a pavement; Disturbed soil sampling from a stockpile; Disturbed soil sampling from a windrow; Undisturbed soil sampling by open-drive sampler

AS 1289.1.2.1, AS 1289.1.3.1, MRWA Method WA 100.1

Not applicable Site selection - Random stratified sampling

AS 1289.1.4.2; MRWA Method WA 0.1

Civiltest Lab 20 Roy Hill Annex Facility

ISO/IEC 17025 (2017)

Infrastructure and Asset Integrity

Service Product Determinant Technique Procedure Limitations
Annex facility Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited The Civiltest Lab 20 Roy Hill Annex Facility, Site no; 25720 is acknowledged for the Roy Hill ROM4 Project Earthworks, contract no: 22-154-001, from 20 September 2021 until 31 July 2022
Civiltest Lab 24-Coolgardie Esperance Highway Annex Facility

ISO/IEC 17025 (2017)

Infrastructure and Asset Integrity

Service Product Determinant Technique Procedure Limitations
Annex facility Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited The Civiltest Lab 24 - Coolgardie Esperance Highway Annex Facility, site no: 25976, is acknowledged from 31 May 2022 until 25 August 2022 for the CE & GF Highway Widening, contract no: 185122
Civiltest Lab 26 – Mardie Annex Facility

ISO/IEC 17025 (2017)

Infrastructure and Asset Integrity

Service Product Determinant Technique Procedure Limitations
Annex facility Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited Civiltest Lab 26 - Mardie Annex Facility, Site No 26011 is established from 7 July 2022 until 1 February 2023 for Mardie Salt and Potash - Evaporation Pond 3, 4 and 5 (Contract No. EN010)
Civiltest Lab 27 Emu Fence Annex Facility

ISO/IEC 17025 (2017)

Infrastructure and Asset Integrity

Service Product Determinant Technique Procedure Limitations
Annex facility Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited The Civiltest Lab 27 - Emu Fence Annex Facility, site no: 26009, is acknowledged for the Emu Fence / Great Eastern Highway Intersection Upgrade contract no: 52278 from 4 July 2022 until 30 Nove4mber 2022. 

The only data displayed is that deemed relevant and necessary for the clear description of the activities and services covered by the scope of accreditation.

Grey text appearing in a SoA is additional freetext providing further refinement or information on the data in the preceding line entry.