Australian Geotechnical Testing

Site

Australian Geotechnical Testing – Melbourne

Accreditation No.

20245

Site No.

22114

Date of Accreditation

01 Jun 2017

Address

66 Abbotts Road
Dandenong South, VIC 3175
Australia

ausgeotest.com.au

Contact

Mr Matt Noonan P: +61 0419349906

Availability

Services available to external clients

Scope of Accreditation

Withdrawn 20 Jun 2024

Voluntary

Australian Geotechnical Testing – Melbourne

ISO/IEC 17025 (2017)

Infrastructure and Asset Integrity

Withdrawn
Service Product Determinant Technique Procedure Limitations
Accreditation is held to establish new branch sitesBrisbane Branch Site 25178 Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited
Establishment of annex facilities Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited
Evaluation of geotechnical and civil construction material - Road pavement surfacing characteristics Road pavements Penetration depth Ball embedment

Austroads Method AGPT/T251

Evaluation of geotechnical and civil construction material - Soil classification Soils Weighted plasticity index Not applicable RC (Vic) Method 326.01
Plastic limit Not applicable

AS 1289.3.2.1

Linear shrinkage Not applicable

AS 1289.3.4.1

Liquid limit Casagrande one point

AS 1289.3.1.2

Moisture content Drying oven

AS 1289.2.1.1

Liquid limit Casagrande four point

AS 1289.3.1.1

Plasticity index Casagrande

AS 1289.3.3.1

Sieve analysis Not applicable

AS 1289.3.6.1

Evaluation of geotechnical and civil construction material - Soil compaction characteristics Soils Dry density/moisture content relationship Standard compactive effort

AS 1289.5.1.1

Dry density/moisture content relationship Modified compactive effort

AS 1289.5.2.1

Assignment of optimum moisture content/maximum dry density (OMC/MDD) Not applicable

AS 1289.5.4.2

Evaluation of geotechnical and civil construction material - Soil dispersion Soils Dispersion Emerson class

AS 1289.3.8.1

Evaluation of geotechnical and civil construction material - Soil field density Soils Moisture ratio Measured

AS 1289.5.4.1

Compaction control Hilf

AS 1289.5.7.1

Moisture ratio Statistical selection of reference values

AS 1289.5.4.3

Dry density ratio Calculation

AS 1289.5.4.1

Dry density ratio Statistical selection of reference values

AS 1289.5.4.3

Density - In-situ Sand-cone

AS 1289.5.3.1

Moisture ratio assessment of dry back Not applicable

RC (Vic) Method 316.14

Density - In-situ Nuclear gauge

AS 1289.5.8.1

Characteristic field density values Not applicable

RC (Vic) Method 316.00

Evaluation of geotechnical and civil construction material - Soil in-situ penetration Soils Penetration in-situ Dynamic cone

AS 1289.6.3.2

Penetration in-situ Perth sand penetrometer

AS 1289.6.3.3

Evaluation of geotechnical and civil construction material - Soil laboratory bearing properties Soils Bearing ratio Assignment of CBR and percent swell RC (Vic) Method 324.01
Bearing ratio Remoulded specimens

AS 1289.6.1.1

Evaluation of geotechnical and civil construction material - Soil permeability Soils Permeability Constant head for a remoulded specimen

AS 1289.6.7.1

Permeability Falling head for a remoulded specimen

AS 1289.6.7.2

Evaluation of geotechnical and civil construction material - Soil pre-treatment Soils Soil pre-treatment Repeated compaction pre-treatment

RC (Vic) Method 301.05

Soil pre-treatment Not applicable

AS 1289.1.1

RC (Vic) Method 301.01

Evaluation of geotechnical and civil construction material - Soil reactivity Soils Reactivity Shrink/swell

AS 1289.7.1.1

Evaluation of geotechnical and civil construction material - Soil stabilisation Soils Laboratory stabilisation of soil Lime stabilisation

RC (Vic) Method 301.03

Laboratory stabilisation of soil Cement

RC (Vic) Method 301.06

Compressive strength Uniaxial unconfined

AS 5101.4

Sample collection Soils Not applicable Disturbed sampling from earthwork; Disturbed soil sampling from a pavement; Disturbed soil sampling from a stockpile; Disturbed soil sampling from a windrow

AS 1289.1.2.1

Not applicable Site selection - Random sampling

AS 1289.1.4.1

Not applicable Site selection - Random stratified sampling

AS 1289.1.4.2

RC (Vic) Method 316.10

Arcadia Annex Facility

ISO/IEC 17025 (2017)

Infrastructure and Asset Integrity

Withdrawn
Service Product Determinant Technique Procedure Limitations
Annex facility Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited The Arcadia Valley Annex Facility, Site No. 22114 is established from 5 January 2022 until 1 July 2022 for works on the Bottle Tree Dam Brine Pond 2 Project, Contract No. 21 449 for Shamrock Civil Engineering Pty Ltd
Cultana Annex Facility

ISO/IEC 17025 (2005)

Infrastructure and Asset Integrity

Withdrawn
Service Product Determinant Technique Procedure Limitations
Annex facility Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited
Phosphate Hill Annex Facility

ISO/IEC 17025 (2005)

Infrastructure and Asset Integrity

Withdrawn
Service Product Determinant Technique Procedure Limitations
Annex facility Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited
Phosphate Hill Cell 5B Annex Facility

ISO/IEC 17025 (2017)

Infrastructure and Asset Integrity

Withdrawn
Service Product Determinant Technique Procedure Limitations
Annex facility Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited Phosphate Hill Cell 5B Annex Facility, Site No 24709 is established from 9 October 2018 until 31 December 2019 for the Gypsum Stack Expansion Cell 5B (Contract No. SCF002904) for Teneo Group.
Stawell Regional Landfill Annex Facility

ISO/IEC 17025 (2005)

Infrastructure and Asset Integrity

Withdrawn
Service Product Determinant Technique Procedure Limitations
Annex facility Materials defined by all or some for which the site is accredited Determinations defined by all or some for which the site is accredited Techniques defined by all or some for which the site is accredited Stawell Regional Annex Facility, Site No. 24763 is established from 19 November 2018 until 30 June 2019 for the Stawell Regional Landfill Cell 4 project for Statewide Recycling Services Pty Ltd.

The only data displayed is that deemed relevant and necessary for the clear description of the activities and services covered by the scope of accreditation.

Grey text appearing in a SoA is additional freetext providing further refinement or information on the data in the preceding line entry.